News Flash

Posted on: June 21, 2022

South Nags Head Multi-Use Path Repair Project

IMG_0496 (Medium)

Repair to the existing concrete multi-use path use path begins in S. Nags Head along S. Old Oregon Inlet Road will begin on June 21, 2022. The scope of work will include removing and replacing damaged sections of the existing concrete multi-use path. The ...

Read on...

Additional Info... Construction Projects
Posted on: June 21, 2022

Old Nags Head Cove Watermain Replacement

water service line

Construction crews are in the process of testing the installed 8" water main between W. Old Cove Rd. and S. Links Drive. Testing procedures include pressure testing, chlorination, and flushing prior to making the physical connection of the water serv...

Read on...

Additional Info... Old Nags Head Cove 2022 Water Main Replacement Project

News Flash