A section of the W. Side Multi-use Path is temporarily closed to pedestrian traffic immediately south of Soundside Rd. The ongoing work is related to the construction of the roadway entrance to the Coastal Villas Subdivision development. It is anticipated the construction will take approximately 2.5 weeks, weather depending, to restore the concrete pathway on either side of the proposed street connection. A temporary gravel surface will be installed within the newly constructed street section and remain in place until paving operations can be completed. Once the concrete pathway has cured and the temporary gravel surface in place, the pathway will be reopened to pedestrian traffic.