News Flash Home
The original item was published from 10/29/2020 10:31:23 AM to 11/30/2020 12:00:02 AM.

News Flash

Home

Posted on: October 29, 2020

[ARCHIVED] Planning and Development Reminders

SW  Cover updated 2019-3-1

The Town of Nags Head Residential Stormwater Program Reminders:

  • A stormwater managment plan is required for all new construction.
  • A stormwater management plan is required for any redevelopment over 500 square feet.
  • Please check the minimum required survey template for what information your surveyor must include. (All the specific elevation points are important, see below.)
  • Check in with your clients early in the process to determine what stormwater measures they prefer. See Residential Stormwater Control Measures - Section 500.
  • Please read through the Stormwater Application Materials  and complete your stormwater plan or make note of any questions for staff. 
  • Once you have completed the above steps, arrange a pre-construction site visit to talk about the proposed project. Contact Kate Jones, Engineering Technician 252-449-4209.

Required Survey Information

Facebook Twitter Email