In 2014 the town completed a pedestrian plan that recommended a prioritized list of pedestrian projects. To date, the town has completed the portion from Eight Street to Hollowell Street. (Phases 1-7) Looking forward, the projects south of Jockeys Ridge State Park are the highest ranked projects from the pedestrian plan and recent FOCUS Nags Head project. The upcoming project phases include the planned construction of a 10’ wide multi-use path from Soundside Rd to Danube Street and a 5’ wide sidewalk connection from Deering St. north to Dune St. (Phase 8A). A second phase (Phase 8B), includes the construction of a 10’ wide multi-use path spanning along the western extents of S. Croatan Hwy. from Baymeadow Drive to Gull Street
Multi Use Path Update
• Phase 8A – Planned construction of a 10' wide Multi Use pathway on the west side of S. Croatan Hwy., spanning from Soundside Rd to Danube St. in conjunction with the construction of a 5' wide sidewalk from Dune St to Deering St (East Side). Field surveying has been completed in association with the preparation of permit drawings. Permit applications have been submitted to state permitting agencies. Bid documentation preparation and bid advertisement are scheduled for next week. Construction for this phase is estimated to commence in Winter/Spring 2020.
• Phase 8B - Planned construction of a 10' wide Multi Use pathway on the west side of S. Croatan Hwy., spanning from Baymeadow Dr to Gull St. Field surveys have been completed. Design development is currently in progress, with an estimated construction commencement timeframe of Winter/Spring 2020.
Please feel free to contact David Ryan, P.E. at 252.441.6221 with any questions.