Bike/Pedestrian Paths

Posted on: September 11, 2020

[ARCHIVED] Multi Use Pathway Update September 11, 2020

Feet on Nags Head Multi Use Path

W. Side Multi-Use Path Construction Update

• Phase 8A – Planned construction of a 10’ wide multi-use pathway on the west side of S. Croatan Hwy., spanning from W. Soundside Rd. to W. Danube St. in conjunction with the construction of a 6’ wide sidewalk from Dune St. to Deering St. (East Side). Construction completed for Phase 8A.

Phase 8B - The construction of the multi-use pathway, spanning from W. Baymeadow Drive to Gull Street is nearing completion. Concrete finish work concluded this week with final grading, seeding, pavement striping, and pavement patching rounding out the remaining construction work.

While construction work remains active, temporary lane closures will be in effect. We ask that motorists exercise caution and slow down when traveling within the active construction work zone.

• Phase 8C - Construction of the multi-use pathway, drainage infrastructure, and concrete curb and gutter has been completed between W. Danube Street and W. Seachase Drive. Construction completed for Phase 8A

Please feel free to contact David Ryan, P.E. at 252.441.6221 with any questions.