- Home
- Government
- Construction Projects
- Engineering
Engineering
Engineering provides a variety of services relating to the planning, design, management, and construction of the Town's capital improvement projects. Additional services include management of the Town's stormwater management infrastructure with planned maintenance, replacement, and drainage infrastructure improvements.
Construction scheduling and coordination is a critical component in successfully completing capital improvement projects. Construction progress maps and updates to large scale construction projects are provided on this page to keep our residents and visitors informed of construction activities and related impacts.
Old Nags Head Cove Water Main Replacement Project
The map above represents the current progress of the Old Nags Head Cove Water Main Replacement Project. The recently installed water main is represented by the blue linework with the orange color representing the sections of water main recently installed but not yet operational and the green dashed line representing the upcoming work schedule.
Tentative Construction Schedule
Week of May 30th- Complete connection of the watermain between S. Links Drive and the golf course and at the end of S. Roanoke Way. Complete water service connections for the portions of the installed water main. Once all service connections are completed, the newly installed water main along S. Cobia Way, W Sandpiper Terrace, and a portion of S. Roanoke Way can commence with testing.
Week of June 6th- Complete pressure testing of the 8" dia. main along S. Cobia Way, W. Sandpiper Terrace, and a portion of S. Roanoke Way. Once pressure tested, the main can be chlorinated, flushed, and placed into operation. Transition to S. Blue Marlin Way to connect the previously bored sections of water main with open cut sections of water main.
The above-referenced schedule is subject to change and will be updated frequently with the most recent information available. Sequencing of items may also vary.
Sidewalk extensions in the Nags Head Acres and Old Nags Head Cove Subdivisions
The map above represents proposed sidewalk extensions in the Nags Head Acres and the Old Nags Head Cove Subdivisions. The Nags Head Acres scope of work has been substantially completed. Concrete crews are currently working in the Old Nags Head Cove Subdivision. Concrete pathway has been installed along W. Old Cove Rd., S. Cobia Way, and through to W. Sandpiper Terrace. Several small infill sections remain along this length. Concrete crews are currently working near the intersection of S. Cobia Way/W. Old Cove Rd. The sidewalk will be extended to the west and north through to W. Old Cove Rd.
-
Construction Projects
Physical Address
5401 S. Croatan Hwy.
Nags Head, NC 27959
Mailing Address
PO Box 99
Nags Head, NC 27959
Phone: 252-441-6221
-
David Ryan
Town Engineer
-
Old Nags Head Cove Watermain Replacement
The watermain replacement continues along S. Pamlico Way in Old Nags Head Cove Subdivision. Read on...